KAC during the year 2020 provided a drainage system at the Barra Fish market grounds. The market always experiences flooding and generates a lot of liquid waste.
Barra is also identified as a hotspot for flooding and the EU through NDMA intervened by constructing a drainage channel at Barra and training community waste management committees.
CHALLENGES
- Council lacks the resources to be able to tackle the issue of waste, especially at the 2 growth centres
- Attitudinal change, waste should be everybody’s business and not looking at the Council alone as responsible
- Sectoral coordination should be enhance